Construction drawings services

  • Create construction drawings for foundation excavation and concrete pouring;

  • Create construction drawings for soft ground improvement;

  • Create construction drawings for piling;

  • Create steel fabrication drawings

These drawings are meticulously completed with high precision and are used in construction projects in Japan. With many years of experience in this field and the application of BIM to enhance product quality, we are confident in meeting the stringent requirements of one of the world’s most demanding markets like Japan.

Process of creating construction drawings

1
Receive design documents (design drawings, BIM models) from Structural Design Department
2
Collaborate with Takeuchi Construction Inc.'s departments to exchange information
3
Apply BIM to create accurate construction drawings in a short period of time
4
Update changes from the Structural Design Department and make make prompt adjustments

Receive design documents (design drawings, BIM models) from Structural Design Department

Receive project design documents, such as architectural drawings, structural drawings, and BIM models from Structural Design Department, then select and compile the necessary information and documentation to serve the implementation of construction drawings. The number of required construction tasks and drawings will vary for each distinct project and depend on the specific needs. Nevertheless, the projects all have the same characteristic of implementing construction using Takeuchi Group’s proprietary TNF method.

Collaborate with Takeuchi Construction Inc.'s departments to exchange information

Efficient and precise construction drawing necessitates the crucial step of establishing communication and information exchange with the relevant departments at Takeuchi Construction Inc. There are 3 primary departments that require communication and information sharing, as outlined below:

  • Design Department: Require verification of the authenticity of the architectural, structural drawings, or BIM models recently received. Prompt and precise communication is necessary for any modifications that occur during the design phase.
  • Laboratory Department: Confirm information related to the experimental results (cement mixing ratio), Points to note that were identified during the experiment.
  • Construction Department: Require a discussion on construction techniques and construction management in order to modify construction drawing plans to be more suited and efficient for the construction process. Furthermore, it is necessary to confirm the completion time of the drawings and any changes during the construction process. Based on this information, adjust the personnel appropriately to ensure the drawings are completed on time as required.

Apply BIM to create accurate construction drawings in a short period of time

Along with the continuous development of technology and the application of advanced technologies, Takeuchi Group, including VINA TAKEUCHI Co., Ltd, is utilizing the BIM model and and tools developed specifically for TNF technology tools to create construction drawings with short turnaround times, high accuracy, and ease of information management and verification. With a young team of employees proficient in using Revit software and applying the TNF Bundle Add-in in the BIM system, we have significantly reduced the time needed to create construction drawings.

Update changes from the Structural Design Department and make make prompt adjustments

Teams collaborate on the BIM model, so when there are design changes, components in other departments can be easily updated and adjusted according to the changes from the design department. BIM also helps manage numerous risks, control every stage, and significantly reduce errors in implementation.