  • Design foundation structures and reinforced floors with hardened materials (cement) using exclusive TNF technology for civil and industrial projects according to Vietnamese standards and Japanese standards.
  • Design foundation with other exclusive technologies: WT (underground water tank), T-BAGS (shock absorber & insulation technology under cold storage floors), and TNF-Hybrid (TNF foundation combined with wooden piles).
  • Design low-rise steel building structures (factories, warehouses, stores, etc.) according to TCVN, AISC, EUROCODE, Japanese standards.
  • Architectural design following Japanese standards and style.
  • BIM: Apply Building Information Modeling (BIM) to optimize the design process and project information management.

Design process

1
Receive information from customer
2
Analyze basic parameters
3
Make a preliminary design
4
Conduct a complete design
5
Handover design, liquidate contract

Receive information from customer

Communicate with customers to gather project’s initial design information, such as geology, location, type of construction, load requirements, etc.

Analyze basic parameters

  • Based on the collected information, analyze and propose a design plan along with relevant design parameters such as foundation dimensions and renovation specifications.

Make a preliminary design

  • Based on the selected plan, start the calculations and preliminary design.
  • Based on the preliminary design, communicate with customer to solve remaining issues (if any).

Conduct a complete design

  • Solve remaining issues and conduct finite element analysis (FEM) for the project.
  • Complete the structural drawings and calculation report.

Handover design, liquidate contract

  • Handover the complete design drawings and calculation report to customer.
  • Liquidate the contract and complete payment procedures.